Northwind Homes

Build with us

Building with Northwind

Start from one of our exclusive floor plans, modify one to fit you, or go fully custom. However you start, we build it right, here in Kalispell and the Flathead Valley.

Path 1

Start from a Northwind plan

Our exclusive floor plans are designed for life in the Flathead Valley.

Build it as designed

Choose one of our floor plans and build it as drawn, with your choice of finishes.

Make it yours

Start with a Northwind plan and modify what you need: add a bedroom, open up the kitchen, expand the garage. We update the drawings with you before we build.

Browse floorplans

Path 2

Custom

A home designed only for you and your land.

Bring your architect's plans

Working with an architect? We'll build from your complete set of plans. Have a basic set? We'll refine it with you so it meets local building codes.

Design from the ground up

No plans yet? We'll design a home around your land, your budget and your must-haves. Most design happens in-house, which helps keep costs down. Want an outside designer or architect? We'll bring one in.

Talk about a custom home

Our process

From first call to move-in

  1. 01

    Tell us where you're at

    Plans or no plans, land or no land, we start with the big picture. Then we map out next steps together.

  2. 02

    Find your land

    Bring your own lot, ask about lots we may have available, or let us help you find one that fits your needs and budget.

  3. 03

    Dial in the details

    We get the plan and finishes set up front, so you know what you're getting. Pick from our standard selections, or we'll source what you want within budget.

  4. 04

    Build

    We keep you updated by email, with walkthroughs along the way and quick answers when you need them.

  5. 05

    Walkthrough and handoff

    We walk the finished home with you to make sure everything is right. Then we hand over the keys and stand behind our work with a warranty.

Questions

Common questions

Do I need to own land before we start?

No. We may have lots available, and we can help you find land that fits your needs and your budget. You're also welcome to bring your own lot.

How long does a build take?

Planning and design typically take 1 to 3 months. Construction typically takes 5 to 9 months after that, depending on the size of the home, permits, changes and weather. Landscaping is separate.

Can I modify a Northwind floor plan?

Yes. Any of our exclusive floor plans can be modified to fit your needs. We update the drawings with you before we build.

How is pricing worked out?

Every build is priced on its own. The biggest factors are the size of the home, your finishes and the site, including terrain, driveway length and how much grading the lot needs. Well and septic, utility runs, foundation type and design complexity also play a role, along with other variables.

Will you build from my architect's plans?

Yes. Bring a complete set of architectural plans and we'll build from them. Starting with a basic set? We'll refine it with you so it reflects what you want and meets local building codes.

Ready to talk about your home?

Tell us where you're at, and we'll map out the next steps.